Order of Operations – Flipping

The typical Order of operations in New Construction are the same across most facets of building construction. The Order of Operations for other projects (which we’ll touch on later) will vary some, but let’s talk specifically about flipping houses.

When you’re flipping a house, the goal is to get in, get done, and get out with the least amount of time and money needed to get the house rented or sold. I’ve flipped several hundred houses, and in doing so I found that many people stress themselves far to much by getting into a big rush. If they would just stick with the order of operations, they could alleviate an awful lot of stress from the project.

Recon/Review
I always start with a simple review of whatever documents are available, and a walk-through of the house. I often times had an inspectors report that showed everything that was not up to code, which certainly made life a lot easier for me, but I also found things in my walk-through that needed to be address, either for safety, common sense, or my investors wishes.
If needed, i’ll get a landscaping crew to come out first and knock back the growth so I can see all the parts and pieces of the house; nothing like trying to see the exterior window conditions when you’re being attacked by thorny bushes after wading through three feet high grass!

Goals
Once i’ve completed my review, I set specific goals for this project, specific things that need to be addressed in a large scale. Notice I did not say ‘Planning’, I said ‘Goals’.
I will usually get a dumpster delivered, perhaps a porta-john or two, and other job-site necessities.
This is also where I lay some ideas down about where to store materials, and other parts of managing my overall job-site.

Demolition
This phase is all about getting all the old crap out of the house and out of the way. The goal is to get all the garbage out of the house and directly into a dumpster, anything that we need to keep out of the way and into some kind of storage.
Demolition is taken as far as needed to uncover all the problems.

Planning
Now that I can see all the parts and pieces I need to see, I can start planning my work. I’ll lay out my plans, select my materials, and start getting things ordered based on Lead and Need times.

Rough-In
This phase is where we get back to ‘real construction’, and closely match the normal order of ops for new building. Having removed ALL of the crap we want gone, we can now start from the bottom up.
This includes all Framing, Sub-Flooring, HVAC, Plumbing, Electrical, Low-Voltage, and get any inspections needed for work up to this point.

Double-Check
I always make a point of double-checking my rough-in work before I start closing things up; nothing worse than having to tear down freshly hung sheetrock so I can fix a little thing in the wall left behind!

Finish-PREP
An often overlooked step, I build in time to PREPARE for an awesome finish.
We make sure all the framing is level, plumb, and even for the material going on it, which usually means removing all the nails, screws, and junk left behind, as well as evening out some places by planing away some sections, or building up others with wood or cardboard strips.

Finish
With all of my rough-in done, it’s time to get the finish work happening. I’ll turn a sheetrock team loose and keep everyone out of their way until they’re done. Then i’ll get the rest of the people in there to finish all the parts and pieces!

Punch List
There’s always a few little things left to deal with at the end of the job, called a ‘Punch List’. I used to have a team of Handymen who I split between handling Punch Lists, Service Calls, and small jobs.

I’ll go over each of these in more detail, as well as the planning and logistics of jobsite and project management.

As always, stay tuned for more, and remember, why do it okay twice when you can do it great once?