Author: Daniel Leach

  • Let there be water (only) in the shower!

    For this project, we turned this: Into this: This customer came to me with concerns of rotted shiplap trim next to the shower due to water sloshing out through the gap between the door and the shower wall. I resolved the trim issue by replacing the pieces with custom cut PVC: I also added a…

  • Kitchen Island Remodel

    For this project, we turned this: Into this: So the customer could pour their own custom epoxy resin countertop. We also moved the electrical outlets from inside the kitchen island bar to the outside of the island: We also added a pop-up outlet in the middle of the new island countertop: This customer reached out…

  • Four Months since I filed the Liens

    Today, July 6th, marks four months since I filed the mechanics liens so I could recover the money Ridge Construction owes me. I have finally heard back from one Title company about paying off one of the liens, but still no answers from Vern about the money he owes me, or the other liens filed.

  • Three Months since I filed the liens

    Today, June 6th, marks three months since I filed the liens for the money Ridge Construction owes me, and so far, nothing heard from Vern, or from any of the liens. I’m still working with an attorney to sort through the mess, but we’re expecting to have to take this to District Court. I’m hoping…

  • Out with the old, in with the new (doors)

    For this project, we turned this: Into this: For the garage walk door, the customer had issues with the door leaking and not closing correctly, with some rotting. It was time to replace it, so we did!I had a few challenges to overcome along the way; the threshold was lower for the door than the…